PowerElements

TE Connectivity's ERNI PowerElements provides various power components with combined elastic and massive press-fit zones. While the massive press-fit zone guarantees torque support and secure fixtures, the flexible press-fit zone provides optimal power transmission. The combined flexible and massive press-fit zone is available in variants for M5, M6, M8, and M10. They can transmit currents of up to 290A per PowerElement (at 20°C) and operate in the temperature range from -40°C to +135°C. The purely massive press-fit zone is available in M3, M4, M5, M6, M8, and M10. These components operate in a temperature range from -40°C to +135°C. Applications for TE Connectivity's ERNI PowerElements include high-current range (central electrical systems, security systems, etc.), hybrid applications, and wherever lots of power is connected to the PCB and transmitted (power boards).

所有結果 (39)

選擇以下類別以檢視篩選選項和縮小搜尋範圍。
選擇 圖像 零件編號 製造商 說明 規格書 供貨情況 定價 (TWD) 基於數量按單價篩選表中結果。 數量 RoHS
TE Connectivity / ERNI 終端 POWELM GEWINK VOLLM D4,2 5 2,54 * EP 14 無庫存前置作業時間 23 週
最少: 2,500
倍數: 2,500

TE Connectivity / ERNI 終端 POWELM GEWINK ZWEIM M4 5 2,54 * EP 14 CU 暫無庫存
最少: 15,000
倍數: 15,000

TE Connectivity / ERNI 終端 POWELM GEWINK ZWEIM M5 5 2,54 * EP 14 CU 無庫存前置作業時間 23 週
最少: 1,000
倍數: 1,000

TE Connectivity / ERNI 終端 POWELM GEWINK ZWEIM M6 8 2,54 * EP 20 CU 無庫存前置作業時間 25 週
最少: 7,800
倍數: 7,800

TE Connectivity / ERNI 終端 POWELM STIFT VOLLM M4 6 2,54 * EP 3,0 * 無庫存前置作業時間 23 週
最少: 25,000
倍數: 25,000

TE Connectivity / ERNI 終端 POWELM STIFT * M3 5 * * SMD 3 SN * * J 3 無庫存前置作業時間 19 週
最少: 2,500
倍數: 2,500

TE Connectivity / ERNI 終端 POWELM STIFT * M4 6 * * SMD 3,5 SN * * J 無庫存前置作業時間 19 週
最少: 2,500
倍數: 2,500

TE Connectivity / ERNI 終端 POWELM STIFT * M5 8 * * SMD 4,5 SN * * J 無庫存前置作業時間 23 週
最少: 25,000
倍數: 25,000

TE Connectivity / ERNI 終端 POWELM STIFT * M6 10 * * SMD 5,5 SN * * 無庫存前置作業時間 23 週
最少: 18,000
倍數: 18,000

TE Connectivity / ERNI 終端 POWELM BUCHSE * M3 3,5 * * SMD 6 SN * 00 無庫存前置作業時間 23 週
最少: 500
倍數: 500

TE Connectivity / ERNI 終端 POWELM BUCHSE * M4 4 * * SMD 7 SN * 0007 無庫存前置作業時間 23 週
最少: 500
倍數: 500

TE Connectivity / ERNI 終端 POWELM BUCHSE * M5 4 * * SMD 7 SN * * J 無庫存前置作業時間 23 週
最少: 1
倍數: 1

TE Connectivity / ERNI 終端 POWELM BUCHSE * M10 11 * * SMD 17,5 SN * 無庫存前置作業時間 25 週
最少: 25,000
倍數: 25,000

TE Connectivity / ERNI 壓鉚螺柱和墊圈 POWELM STIFT ZENTR M6 10 * * SMD 5,5 SN 無庫存前置作業時間 25 週
最少: 25,000
倍數: 25,000