Texas Instruments OPA3S328EVM Op Amp Evaluation Module (EVM)
Texas Instruments OPA3S328EVM Op Amp Evaluation Module (EVM) is designed to provide access to the features and measure the performance of the OPA3S328. The Texas Instruments OPA3S328 is a precision, low-voltage CMOS operational amplifier with integrated switches optimized for flexible transimpedance applications.Features
- Two independent sites with the OPA3S328 devices built into different transimpedance circuit configurations
- High-speed (40MHz)
- High-precision (25µV)
Top Board Overlay
發佈日期: 2021-08-11
| 更新日期: 2022-03-18
