The TI TLIN1431x-Q1 single-channel LIN SBCs, include LDO, wake, high-side switch, watchdog, integrated battery voltage divider, LIMP, and channel expansion functionality.
The TLIN1431EVM evaluation module permits both commander and responder mode applications to be demonstrated by using a single jumper that connects or disconnects the external 1kΩ pull-up resistor and series diode required in commander mode applications on the LIN bus.
Features
- Provides access to LIN bus, TXD, and RXD pins
- WAKE switch for generating WAKE signal
- Adjacent jumper connections allow for SPI communication
- Test point-style and header-style connections for signals
- Compatible with both LDO versions of the TLIN1431x-Q1
PCB Layout
發佈日期: 2023-01-20
| 更新日期: 2023-02-01

