Texas Instruments TPS785EVM-033 Regulator Evaluation Module

Texas Instruments TPS785EVM-033 Regulator Evaluation Module (EVM) is designed for a typical configuration to evaluate the operation and performance of the TPS785-Q1. The TPS785-Q1 is a 1A, low-IQ, low-dropout (LDO) regulator. The Texas Instruments TPS785EVM-033 is configured to be a reference design for engineering applications requiring current to a dynamic load of up to 1A. This particular evaluation module configuration contains a single 1A low-IQ, low-dropout regulator for automotive systems. The regulator is capable of delivering up to 1A to the load with a VIN range of 1.65V to 6V.

Features

  • 2V to 6V low input-voltage range
  • 2% accuracy over load, line, and temperature
  • Low quiescent current (IQ)
  • Active output discharge

Board Layout

Mechanical Drawing - Texas Instruments TPS785EVM-033 Regulator Evaluation Module
發佈日期: 2021-06-21 | 更新日期: 2022-03-11