All Results (1,308)

Select Image Part # Mfr. Description Datasheet Availability Pricing (TWD) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Semtech RCLAMP04052P.F
Semtech ESD Protection Diodes / TVS Diodes 2-Line 4V 15A unidirectional SLP1006P3 Non-Stocked Lead-Time 26 Weeks
Cut Tape
NT$18.64
NT$8.32
NT$7.28
NT$5.45
Reel
NT$3.33
Min.: 1
Mult.: 1
: 15,000
Semtech RCLAMP04091ZA.F
Semtech ESD Protection Diodes / TVS Diodes 1-LINE 4V 0.8PF 20A BI SLP0603P2X3F Non-Stocked Lead-Time 26 Weeks
Reel
NT$3.33
Min.: 15,000
Mult.: 15,000
: 15,000
Semtech RCLAMP0572ZCTFT
Semtech ESD Protection Diodes / TVS Diodes RCLAMP 2-LINE 5V 0.3PF Non-Stocked Lead-Time 26 Weeks
Cut Tape
NT$27.60
NT$17.35
NT$11.11
NT$8.28
Reel
NT$4.37
Min.: 1
Mult.: 1
: 15,000
Semtech RCLAMP0582NQTCT
Semtech ESD Protection Diodes / TVS Diodes RAILCLAMP 2-LINE 5V 0.2PF Non-Stocked Lead-Time 26 Weeks
Reel
NT$11.01
Min.: 3,000
Mult.: 3,000
: 3,000
Semtech RCLAMP1521ZATFT
Semtech ESD Protection Diodes / TVS Diodes 1-Line 12V 0.5pF 4A Non-Stocked Lead-Time 26 Weeks
Reel
NT$3.62
Min.: 15,000
Mult.: 15,000
: 15,000
Semtech RCLAMP2461ZC.F
Semtech ESD Protection Diodes / TVS Diodes 1-Line 24V Bi 0.20pF SLP0603P2X3J Non-Stocked Lead-Time 26 Weeks
Cut Tape
NT$2.12
Min.: 30,000
Mult.: 15,000
: 15,000
Semtech RCLAMP2461ZC.N
Semtech ESD Protection Diodes / TVS Diodes 1-Line 24V Bi 0.20pF SLP0603P2X3J Non-Stocked Lead-Time 26 Weeks
Cut Tape
NT$2.08
Min.: 20,000
Mult.: 10,000
: 10,000
Semtech RCLAMP3321ZCTFT
Semtech ESD Protection Diodes / TVS Diodes 1-LINE 3.3V 0.30PF ESD SLP0603P2X3J Non-Stocked Lead-Time 26 Weeks
Reel
NT$3.84
Min.: 15,000
Mult.: 15,000
: 15,000
Semtech RCLAMP3324PQTNT
Semtech ESD Protection Diodes / TVS Diodes 4-LINE 3.3V 0.65PF 0.15 OHMS Non-Stocked
Reel
NT$15.88
Min.: 10,000
Mult.: 10,000
: 10,000
Semtech RCLAMP3631P.TCT
Semtech ESD Protection Diodes / TVS Diodes 1-LINE 3.63V 0.35PF 30KV ESD SLP1006P2 Non-Stocked Lead-Time 26 Weeks
Cut Tape
NT$27.25
NT$12.26
NT$10.76
NT$8.17
NT$8.03
Reel
NT$5.92
Min.: 1
Mult.: 1
: 3,000
Semtech RCLAMP3951ZATFT
Semtech ESD Protection Diodes / TVS Diodes RCLAMP, 1-LINE 3.3V 0.55PF Non-Stocked Lead-Time 26 Weeks
Reel
NT$2.94
Min.: 15,000
Mult.: 15,000
: 15,000
Semtech RDK-12GCONV-02
Semtech Video IC Development Tools UHD-SDI CONVERTER REFERENCE DESIGN Non-Stocked Lead-Time 15 Weeks
NT$36,618.27
Min.: 1
Mult.: 1
Semtech RDK-AVP2000T-00
Semtech Semtech Corporation RDK-AVP products copper/fiber, RX/TX/TR
This product may require additional documentation to export from the United States.
Non-Stocked Lead-Time 50 Weeks
NT$62,385.81
Min.: 1
Mult.: 1
Semtech RDK-GS12070-000
Semtech Power Management IC Development Tools GS12070 GEARBOX EVAL BOARD WITH IO CARDS Non-Stocked
NT$51,720.08
Min.: 1
Mult.: 1
Semtech RDK-GS12170-S2S00
Semtech Video IC Development Tools GS12170 HDMI to SDI Conversion RDK Non-Stocked
NT$32,266.43
Min.: 1
Mult.: 1
Semtech RDK-12GSRD-ALTRA01
Semtech Daughter Cards & OEM Boards ALTERA ARRIA 10 REF DESIGN DAUGHTER CARD Non-Stocked
NT$21,604.29
Min.: 1
Mult.: 1
Semtech RDK-3GRXTXO-ALTR01
Semtech Video IC Development Tools Altera interfacing SerDes Ref. design Non-Stocked
NT$21,604.29
Min.: 1
Mult.: 1
Semtech RDK-3GRXTXO-XLNX01
Semtech Video IC Development Tools Xilinx interfacing SerDes Ref. design Non-Stocked
NT$21,604.29
Min.: 1
Mult.: 1
Semtech RDK-GS12170-H2S01
Semtech Video IC Development Tools GS12170 HDMI-to-SDI RDK with SiT95145 Non-Stocked
NT$25,382.88
Min.: 1
Mult.: 1
Semtech RDK-SFP+-COPPER00
Semtech Clock & Timer Development Tools SFP+ 8.5Gb/s 30AWG 8 meter Cable Non-Stocked Lead-Time 15 Weeks
NT$33,927.72
Min.: 1
Mult.: 1
Semtech RDK-SFP+-COPPER01
Semtech Clock & Timer Development Tools SFP+ 8.5Gb/s 24AWG 15 meter Cable Non-Stocked Lead-Time 15 Weeks
NT$28,838.82
Min.: 1
Mult.: 1
Semtech RDK-SFP+-COPPER03
Semtech Clock & Timer Development Tools SFP+ 10Gb/s 30AWG 7 meter Cable Non-Stocked Lead-Time 15 Weeks
NT$33,927.72
Min.: 1
Mult.: 1
Semtech RDK-SFP+-COPPER04
Semtech Clock & Timer Development Tools 8.5Gb/s board and housing pair Non-Stocked Lead-Time 15 Weeks
NT$24,568.72
Min.: 2
Mult.: 1
Semtech RDK-SFP+-COPPER05
Semtech Clock & Timer Development Tools 10Gb/s board and housing pair Non-Stocked Lead-Time 15 Weeks
NT$27,993.47
Min.: 1
Mult.: 1
Semtech SC2424CSWTRT
Semtech Switching Controllers MULTIPHASE CURRNT MODE CONTRLR Non-Stocked
Reel
NT$128.34
Min.: 1,000
Mult.: 1,000
: 1,000